Perform (space charge calibration) across all mA stations.
Section 2: Unpacking, Hardware Assembly, and Mechanical Installation
Attach the manual or automatic collimator to the tube port flange, ensuring the internal mirror is clean and undamaged.
DRGEM systems offer customizable power output ranging from 32 to 82 kW, allowing facilities to select the appropriate configuration for their diagnostic needs. Prior to installation, verify that the facility’s electrical infrastructure can support the selected power level. The installation should be performed by qualified electricians familiar with medical imaging equipment requirements.
: Apply a uniform layer of high-dielectric silicone grease to the rubber terminal plugs. drgem x ray service manual install
Mount the manual or automatic collimator to the tube port flange, ensuring the centering pin aligns perfectly.
Secure ceiling and floor rails. Use a plumb bob to ensure the floor rail centerline is exactly 19mm ahead of the ceiling rail for proper alignment.
Perform an offset calibration (dark current calibration) to map and compensate for any inherent electronic noise in the detector pixels.
:
: Wire the room door safety switches to the designated interlock terminals on the main PCB to prevent exposures when doors open.
To help you troubleshoot or complete a specific part of your setup, let me know:
Before opening crates, verify that the shipping indicators are not activated.
Link the display console and the PC interface module to the main generator cabinet. Phase 3: Calibration & Troubleshooting Perform (space charge calibration) across all mA stations
This paper provides a thorough, long-form guide covering the installation, commissioning, routine service, preventative maintenance, troubleshooting, and safety practices for DRGEM digital radiography X‑ray systems. It is intended for biomedical engineers, clinical engineering teams, service technicians, and hospital facilities managers responsible for deploying and maintaining DRGEM flat‑panel digital X‑ray units. Contents include pre‑installation planning, site requirements, unpacking and inspection, mechanical and electrical installation, software setup and network integration, image receptor calibration, QA procedures, daily/weekly/monthly maintenance checklists, parts replacement procedures, fault diagnosis flowcharts, radiation safety considerations, recordkeeping, and a sample service log and parts list.
This public link is valid for 7 days and shares a thread, including any personal information you added. This link or copies made by others cannot be deleted. If you share with third parties, their policies apply. Can’t copy the link right now. Try again later.
DRGEM generators typically require a stable 3-phase, 380V/400V/480V or single-phase 220V/230V AC power supply, depending on the specific kilowatt (kW) rating of the model.
咨询QQ:1359218528|发帖须知!|Archiver|手机版|小黑屋|UG爱好者论坛 ( 京ICP备10217105号-2 )
GMT+8, 2026-3-9 06:46
Powered by Discuz! X3.5 Licensed
© 2001-2025 Discuz! Team.