The concrete pad should be at least 3700 mm x 1400 mm x 150 mm.
Vertically adjustable pads range from 105–165 mm; stationary pads sit at 95 mm. Power Supply: Standard 3/PE AC 50 Hz 380–415 V. Motor: 3 kW engine power. hofmann duolift gte 2500 manual
Stop operation immediately. Check synchronization cables or electronic sensor alignment. Dry lifting spindles; worn load nuts.
The GTE 2500 features a drive-over base frame that stands a mere Power Supply: Standard 3/PE AC 50 Hz 380–415 V
Check the main workshop breaker and internal control box fuses. Allow motors to cool.
This article provides an in-depth look at the GTE 2500's specifications, installation overview, operating instructions, and critical maintenance routines. 1. Introduction to the Hofmann Duolift GTE 2500 Check synchronization cables or electronic sensor alignment
Fresh concrete must cure completely for at least 28 days before anchor installation. Electrical Connections
Electro-mechanical (Dual motors with a connecting base chain) Lifting/Lowering Time: Approximately 45 to 50 seconds